Maldives- Harbour Reconstruction4.jpg

4 Islands Sewerage Upgrade Project

Location: Republic of Maldives

Year: 2007

Description: This project is providing sewer collection systems to new and existing housing on these islands as well as provisions for marine outfalls. The project involves some similar aspects as required by this harbour rehabilitation project with a process of planning / study, concept design, detailed design and construction supervision of the systems is required.

Maldives- Harbour Reconstruction3.jpg

Improvement of Tuna Industry

Location : Republic of Mauritius

Year: 2008

Description:

1. Assess the tuna resources that could be fished and their potential for development;

2. Develop a plan indicating the rationale, objective, cost estimates, funding, implementation arrangement for the development of a longline fishery;

3. Evaluate the infrastructure in place and identify additional infrastructure needs to support domestic tuna longlining in Mauritius;

4. Propose vessel parameters for the tuna longline vessel(s) to be based in Mauritius taking into account the prevailing conditions;

5. Estimate the probable fish catches for domestic tuna longliners;

6. Investigate any impact of such a fishery on the marine environment and propose mitigating measures, if any;

7. Assess economic viability of investment and development for a longline fishery;

8. Identify sources of funding for the implementation of a longline fishery;

9. Identify the necessary human resources skill including training needs requirements for the longlining fishery;

10. Investigate marketing aspects both for local and export and potential for value addition.

Maldives- Harbour Reconstruction2.jpg

Rehabilitation of Tsunami Damaged Harbors in Lh. Hinnavaru, Th.Veymandoo & Th. Thimarafushi

Location: Republic of Maldives

Year: 2008

Description: Consultancy for the design, tendering and construction supervision harbours constructed in the following islands. The harbours of these islands were severely damaged in the December 2004 Tsunami

  • Lhaviyani Hinnavaru

  • Thaa Thimarafushi

  • Gdh Thinadhoo

King Salman Mosque.jpg

Project Management of King Salman Mosque

Location: Republic of Maldives

Year: 2017

Description: The Project is a ‘Landmark’ modern Mosque Complex on the Eastern end of Male’ by the side of Boduthakurufaanu Road in close proximity to China-Maldives Friendship bridge and Artificial Beach, It is a 40m+ high structure encircled by 5 nos. of 50m high minarets, having Basement + Ground Floor + 6 Floors and with a covered area of 2,716.65 M2, and with a gross floor area approximately 10,000 M2. being built on a plot of area 9.600 M2. The mosque square area, 7,500 M2, surrounding the mosque is envisioned to be built to accommodate 6,500 people for praying on special occasions and would be suitably landscaped. The project is consisting of following facilities and space allocation

1. Mosque Square: envisioned to accommodate 6500 people for praying

2. Basement Floor – Ablution Areas, Mechanical/Service area, Staff areas

3. Ground Floor level- prayer hall, VIP holding area, Services area, Lobby, bed lift

4. First floor: Prayer hall, imam room, store/sound room, bed

5. Second floor: multi-purpose hall, lobby, pre-function area, VIP holding area and maintenance area.

6. Third Floor: auditorium includes 4 seminar rooms, pre function room

7. Fourth Floor: Islamic Library and Resource center

8. Fifth Floor: Centre for Quran Studies

Mosque Square: envisioned to accommodate 6500 people for praying

Type of Project- ‘Landmark’ modern Mosque Complex

Covered Area- 2,716.65 square meters

Gross Floor Area- Approx. 10,000 square meters

Plot Area - 9,600 square meters

2.jpg

PCMH hospital, Ola During hospital & Connaught hospital in Freetown

Location : Sierra Leone

Year: 2014

Description:

To achieve efficient health care delivery, there is need for continuum of care from primary to secondary and tertiary levels. This requires that tertiary hospitals are adequately resourced in terms of staff and equipment to meet the challenges of emergencies. The various facilities are:

a) PCMH Hospital

· Establish a neonatal intensive care unit (NICU), Construct an oxygen plant, improve the water supply situation of the hospital, and establish a high dependency unit (ICU).

b) Ola During hospital

· Construct a Pediatric surgical ward, Construct an oxygen plant.

c) Connaught hospital

Construct an Accident and Emergency unit., Establish a dialysis unit

3.Hithadhoo hospital site_3.jpg

Seenu Hithadhoo Regional Hospital Project

Location: Republic of Maldives

Year: 2017

Description: For the better healthcare facility in the southern region of Maldives, the Government of Maldives has decided to construct a 100 bed regional tertiary hospital at Hithadhoo, Addu City. The existing Hithadhoo Regional Hospital with a bed capacity of 50, persons is equipped to handle only the routine and minor medical services . The Government of Maldives therefore will convert the existing Equatorial Convention Centre (ECC) with required additional buildings into a 100 bed hospital facility. ECC is a 2 story building,. ECC site has an area of 77,028.45 Square Meters (7.7 Hectares) with natural landscaping features. The total footprint area of the ECC building is 7,533.36 Sqm.

Feeder and Agricultural Roads Project

Location: St Lucia

Year: 2011

Description:

The Government of St. Lucia, with the financial support of the Kuwait Fund for Arab Economic Development (KFAED) is carrying out a programme to improve 30 km of Feeder and Agricultural Roads that have yet to be rehabilitated under the various rehabilitation programmes such as the Roads Development Programme (RDP), the Tertiary Roads Rehabilitation Programme (TRRP) or the East Coast Road Project (ECRP).

Maldives- Harbour Reconstruction.jpg

Construction of Harbors for Tsunami Victims Project

Location: Republic of Maldives

Year: 2014

Description: The works consist of the construction of all harbour components for harbours in Ha.Hoarafushi, Ha.Ihavandhoo, , Ba.Dharavandhoo, Ba.Goidhoo, Ka.Kaashidhoo, Ka.Dhiffushi, Gdh.Dhevvadhoo , Aa. Mathiveri and Th.Hirilandhoo including construction of new quay walls, breakwaters, entrance channels, navigational aids etc along with all temporary works and general requirements, with the following functional requirements constructed.

· Fish Landing Facility

· Loading/unloading of cargo space

· Passenger Ferry/Boat facilities

· Mooring of mainly locally registered vessels

· Recharging of fuel and water for the vessels

· Boat beaching for repair and maintenance

Zimbabwe hospital.jpg

Construction of Two District Hospitals in Harare City

Location: Zimbabwe

Year: 2017

Description: The Project objective is to improve referral system through introducing the secondary level of health care unlike status quo whereby patients are being referred from primary care (clinics) level to other appropriate hospitals.

This will result in the appropriate and efficient utilization of all levels of care. Also an access to health care facilities, reduce overcrowding at Central Hospitals as well as reduce the overall cost of health cost. The proposed district hospitals would improve the referral system through introducing the secondary level of health care unlike status quo whereby patients are being referred from primary care (clinics) level to tertiary care level (Central hospitals). This will result in the appropriate and efficient utilization of all levels of care.

 
Seychelles Feasibility.jpg

Feasibility Study For The Project Of Enhancing The Electricity Network For South Mahe Island

Location: Seychelles

Year: 2013

Description:

Feasibility study, Detailed design and Tender documentation of the 33 kV transmission and distribution network design entailing the installation of:

·Two 33 kV underground circuits between Seychelles International Airport and Anse Boileau/Barbarons with the provision of new 33 kV substation at Providence, 33 kV switching substation at Turtle-bay,33 kVsub-stations at Anse Royale,Quatre- Bornes, Takamaka, BaieLazare, A. La Mouche and upgrading of AnseBoileau sub­station.

·One 33kV underground circuit between Roche Caiman to switching substation at Turtle Bay and then a dual circuit overhead network from Turtle bay to AnseBoileau substation via Montagne Poseeto increase the power transfer capability and transmission network security in the event of breakdowns on the system.

·Extension of the existing 33 kV overhead line from Dugand to Port Launay via Port Glaud. 33kV Overhead circuit from Dugand to Port Claud and then Underground circuit from Port Glaud to Port Launay Sub-station.

PCMH hospital, Ola During hospital & Connaught hospital in Freetown.jpg

Design and Supervision of Primary Health Care Support Project for Strengthening Eight Primary Health Care Units

Location: Sierra Leon

Description: The project will involve construction of 8 Community Health Centre’s in the four project districts (two each in Bombali, Kambia, Port Loko, and Tonkolili) as specified in the detailed design brief at section 1.4. It will additionally involve:

· supply of medical equipment and medical furniture,

· supply of non-medical furniture,

· supply of drugs and consumables which include inter-alia, medicine for malaria treatment, antibiotics, vitamins, vaccines, etc. for one year, supply of two ambulances, and strengthening of project co-ordination.

South Eastern University Phase- IA

Location: Sri Lanka

Year: 2011

Description: The scope of works envisages the design, project management and construction supervision of a number of RC building structures. In addition, the design and document phase of the assignment is to be carried out within a 6 month time frame. The project components are as follows:-

1. Building Complex for Student Hostel.

2. Building Complex for Health Centre.

3. Sports & Athletic Grounds & Pavilion.

• Ground Area.

• Pavilion.

4. Building Complex for Faculty of Islamic Studies & Arabic.

5. Building Complex for Faculty of Information Technology.

6. Building Complex for Student Centre (Canteen, Common Room, Recreation etc…)

7. Staff Accommodation (22 units with floor area of each unit – 120.0

 

Extension of Mangochi Potable Water Supply Project, Republic of Malawi

Location: Mangochi, Ntakataka

Year: 2020 - 2024

Description:

The Government of Malawi (GoM) intends to provide adequate, reliable and sustainable water and sanitation services to the population of Malawi to meet the ever-increasing demand for safe water for domestic, institutional, industrial, commercial and agricultural use, with special focus on the urban poor and rural communities. The project intends to contribute to the socio-economic growth in Malawi through tourism and improving the health and livelihood of the population through provision of sustainable clean water.

The Southern Region Water Board (SRWB), through the GoM has sourced finances from Kuwait Fund for Arabic Economic Development (KFAED) to extend water supply services to Lakeshore areas up to Ntakataka Trading centre which is about 50km from Mangochi Boma.

Project components include water purification plant with a total capacity of about 13,500 m3/day, purified water supply pumping system with 3 pumps, purified service concrete and steel tanks with a total capacity of about 4,300m3, water distribution network of about 85km, construction of 15 communal water points, intake structures comprising of three submersible pumps; a suction and raw water DI pipe with a total length of about 2.8km, house water supply connections and also supply of about 10,000 prepaid water meters with all its accessories, as well as provision of fully furnished Guest House.